Permit: TR-UTL-0323-01113
Permit Details
Apply Date:
03/17/2023
Applicant:
Cox Communications
Description:
COX TO TRENCH 102' AND OVERLASH 179' TO PLACE NEW VAULT FOR CONDUIT SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-0323-01113
Permit Status: Complete
Permit Description: COX TO TRENCH 102' AND OVERLASH 179' TO PLACE NEW VAULT FOR CONDUIT SYSTEM TIE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/27/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/07/2023 | REQUIRES RESUBMIT |
04/24/2023 | RIGHT-OF-WAY REVIEW v.2 | 04/27/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0323-01113
Permit Status: Complete
Permit Description: COX TO TRENCH 102' AND OVERLASH 179' TO PLACE NEW VAULT FOR CONDUIT SYSTEM TIE
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
04/04/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0323-01113
Permite Description: COX TO TRENCH 102' AND OVERLASH 179' TO PLACE NEW VAULT FOR CONDUIT SYSTEM TIE
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/14/2023 | TRSP - ROW - Recurring | N/A | Complete (Recurring) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0323-01113
Permit Description: COX TO TRENCH 102' AND OVERLASH 179' TO PLACE NEW VAULT FOR CONDUIT SYSTEM TIE
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/24/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
08/10/2023 | TRSP - ROW - Final/Close-Out | Passed |