Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0323-01089
Permit Details
Apply Date:
03/14/2023
Applicant:
DOONE BAKER
Description:
N.972137 - KAHNA Trenching - 18' Aerial - 2451' Boring and Trenching to place new CTL Cabinet, plus other buried sections. Along with Areial Over-Lash and Placement.
Permit Reviews
Permit Number - TR-UTL-0323-01089
Permit Status: Complete
Permit Description: N.972137 - KAHNA
Trenching - 18'
Aerial - 2451'
Boring and Trenching to place new CTL Cabinet, plus other buried sections. Along with Areial Over-Lash and Placement.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/26/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/28/2023 | APPROVED |
03/23/2023 | RIGHT-OF-WAY REVIEW v.1 | 04/10/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0323-01089
Permit Status: Complete
Permit Description: N.972137 - KAHNA
Trenching - 18'
Aerial - 2451'
Boring and Trenching to place new CTL Cabinet, plus other buried sections. Along with Areial Over-Lash and Placement.
Date | Description | Comments |
---|---|---|
04/10/2023 | Aerial Installation | |
04/04/2023 | City Limits Only | |
04/04/2023 | Sun Tran | |
04/04/2023 | Work Location | |
04/04/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0323-01089
Permite Description: N.972137 - KAHNA
Trenching - 18'
Aerial - 2451'
Boring and Trenching to place new CTL Cabinet, plus other buried sections. Along with Areial Over-Lash and Placement.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/31/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0323-01089
Permit Description: N.972137 - KAHNA
Trenching - 18'
Aerial - 2451'
Boring and Trenching to place new CTL Cabinet, plus other buried sections. Along with Areial Over-Lash and Placement.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/28/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
12/28/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
12/28/2023 | TRSP - ROW - Field Change Request | Passed | ||
12/28/2023 | TRSP - ROW - Recurring | Passed |