Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0323-01011
Permit Details
Apply Date:
03/03/2023
Applicant:
Meghan Lilly
Description:
P.081798 - KAHANA Boring - 0' Trenching - 13' Aerial - 0' Borning and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Areial Over-Lash and Placement.
Permit Reviews
Permit Number - TR-UTL-0323-01011
Permit Status: Complete
Permit Description: P.081798 - KAHANA
Boring - 0'
Trenching - 13'
Aerial - 0'
Borning and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Areial Over-Lash and Placement.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/19/2023 | RIGHT-OF-WAY REVIEW v.1 | 03/24/2023 | APPROVED |
Conditions
Permit Number - TR-UTL-0323-01011
Permit Status: Complete
Permit Description: P.081798 - KAHANA
Boring - 0'
Trenching - 13'
Aerial - 0'
Borning and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Areial Over-Lash and Placement.
Date | Description | Comments |
---|---|---|
03/24/2023 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0323-01011
Permite Description: P.081798 - KAHANA
Boring - 0'
Trenching - 13'
Aerial - 0'
Borning and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Areial Over-Lash and Placement.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/27/2023 | TRSP - ROW - Recurring | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0323-01011
Permit Description: P.081798 - KAHANA
Boring - 0'
Trenching - 13'
Aerial - 0'
Borning and/or Trenching to place new CTL Cabinet, plus other buried sections. Along with Areial Over-Lash and Placement.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/05/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
05/10/2023 | TRSP - ROW - SITE INSPECTION | Passed |