Permit: TR-UTL-0226-00394
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2521 N GOYETTE AV
Address NEW:
2521 N GOYETTE AV
Apply Date:
02/25/2026
Applicant:
Adrien Pineda
Description:
*90 DAYS* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 2521 N GOYETTE AV
Permit Reviews
Permit Number - TR-UTL-0226-00394
Permit Status: Complete
Permit Description: *90 DAYS*
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 2521 N GOYETTE AV
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/25/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/02/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00394
Permit Status: Complete
Permit Description: *90 DAYS*
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 2521 N GOYETTE AV
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/02/2026 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 03/02/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 03/02/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 03/02/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00394
Permit Description: *90 DAYS*
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 2521 N GOYETTE AV
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/02/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/02/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/02/2026 | TRSP - ROW - Final | Passed |