Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0226-00389
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
517 W HELEN ST
Address NEW:
517 W HELEN ST
Apply Date:
02/25/2026
Applicant:
Adrien Pineda
Description:
*90 DAYS* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 517 W HELEN ST
Permit Reviews
Permit Number - TR-UTL-0226-00389
Permit Status: Inspections
Permit Description: *90 DAYS*
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 517 W HELEN ST
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/25/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/27/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00389
Permit Status: Inspections
Permit Description: *90 DAYS*
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 517 W HELEN ST
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/27/2026 | Hard Closure - |
| 02/27/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/27/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 02/27/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0226-00389
Permit Description: *90 DAYS*
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 517 W HELEN ST
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | precon scheduled on site |