Permit: TR-UTL-0226-00381
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1831 S SARNOFF DR
Address NEW:
1831 S SARNOFF DR
Apply Date:
02/24/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T169013. TEP will be working in ROW to change out equipment (transformer) like for like and installing additional equipment (Secondary Pedestal), installing conductor in contractor provided trench to a meter installation for this project. No digging required, possible sidewalk impact.
Permit Reviews
Permit Number - TR-UTL-0226-00381
Permit Status: Complete
Permit Description: WO T169013. TEP will be working in ROW to change out equipment (transformer) like for like and installing additional equipment (Secondary Pedestal), installing conductor in contractor provided trench to a meter installation for this project. No digging required, possible sidewalk impact.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2026 | RIGHT-OF-WAY REVIEW v.2 | 02/27/2026 | APPROVED |
| 02/24/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/26/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00381
Permit Status: Complete
Permit Description: WO T169013. TEP will be working in ROW to change out equipment (transformer) like for like and installing additional equipment (Secondary Pedestal), installing conductor in contractor provided trench to a meter installation for this project. No digging required, possible sidewalk impact.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 02/25/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/26/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 02/27/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 02/27/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 02/27/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/27/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00381
Permit Description: WO T169013. TEP will be working in ROW to change out equipment (transformer) like for like and installing additional equipment (Secondary Pedestal), installing conductor in contractor provided trench to a meter installation for this project. No digging required, possible sidewalk impact.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Site is ready for work to begin when contractor is ready, Tucson Electric Power is aware of the requirements that the City of Tucson require | |
| 04/02/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is now complete and all traffic control has been removed but during construction traffic control was set up according to the TCP | |
| 04/02/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete | |
| 04/02/2026 | TRSP - ROW - Final | Passed | Work is complete |