Permit: TR-UTL-0226-00358
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
6520 E STELLA RD
Address NEW:
6520 E STELLA RD
Apply Date:
02/20/2026
Applicant:
ANGEL MORALES
Description:
P.092921 B PLACE 5186' OF AERIAL FIBER CABLE (private property & COT ROW)
Permit Reviews
Permit Number - TR-UTL-0226-00358
Permit Status: Issued
Permit Description: P.092921 B
PLACE 5186' OF AERIAL FIBER CABLE (private property & COT ROW)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/02/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00358
Permit Status: Issued
Permit Description: P.092921 B
PLACE 5186' OF AERIAL FIBER CABLE (private property & COT ROW)
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 02/24/2026 | COT ROW |
| 02/24/2026 | PRE-CON/SIDEWALK |
| 02/24/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 03/02/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 03/02/2026 | Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced |
| 03/02/2026 | ARTERIAL/COLLECTOR PAVEMENT MORATORUIM - |
| 03/02/2026 | Local Pavement Moratorium |
| 03/02/2026 | Traffic control set-up approved between 9AM - 3:30PM |