Permit: TR-UTL-0226-00344
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1145 N ALVERNON WY
Address NEW:
1145 N ALVERNON WY
Apply Date:
02/19/2026
Applicant:
Matt Johnson
Description:
EXCAVATING A 5X5 TRENCH TO ABANDON GAS SERVICE IN ROW IN CONCRETE AND DIRT. TRENCH WILL BE LOCATED AT SOUTH WEST CORNER OF E BELLEVUE ST AND N ALVERNON WAY
Permit Reviews
Permit Number - TR-UTL-0226-00344
Permit Status: Complete
Permit Description: EXCAVATING A 5X5 TRENCH TO ABANDON GAS SERVICE IN ROW IN CONCRETE AND DIRT. TRENCH WILL BE LOCATED AT SOUTH WEST CORNER OF E BELLEVUE ST AND N ALVERNON WAY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/25/2026 | RIGHT-OF-WAY REVIEW v.2 | 02/26/2026 | APPROVED |
| 02/19/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/24/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00344
Permit Status: Complete
Permit Description: EXCAVATING A 5X5 TRENCH TO ABANDON GAS SERVICE IN ROW IN CONCRETE AND DIRT. TRENCH WILL BE LOCATED AT SOUTH WEST CORNER OF E BELLEVUE ST AND N ALVERNON WAY
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/23/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/26/2026 | Bike Lane Access and Accommodation |
| 02/26/2026 | Pedestrian Access & Sidewalk |
| 02/26/2026 | Pre-Activity Meeting w/Inspections |
| 02/26/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00344
Permit Description: EXCAVATING A 5X5 TRENCH TO ABANDON GAS SERVICE IN ROW IN CONCRETE AND DIRT. TRENCH WILL BE LOCATED AT SOUTH WEST CORNER OF E BELLEVUE ST AND N ALVERNON WAY
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/03/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/27/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 03/27/2026 | TRSP - ROW - Final | Passed |