Permit: TR-UTL-0226-00340
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4925 S RIVER RUN DR
Address NEW:
4925 S RIVER RUN DR
Apply Date:
02/19/2026
Applicant:
ANGEL MORALES
Description:
**REPLACEMENT RECORD FOR TR-UTL-1025-01906 - PRECON CMP 2/18, NO WORK PREVIOUSLY COMPLETED. ARCHAELOGICAL MONITOR COORDINATION BEING DONE UNDER ORIGINAL RECORD** P.169094C KAHNA BORE 3859' & TRENCH 60' TO PLACE CONDUIT AND FIBER CABLE. PLACE 24 FLOWER POTS AND 15 PEDESTALS 03/31/26(IEB)-- Rev uploaded: Updated construction quantities and documents. Pedestals/Cabinets/Vaults revised to 42; Splice bore pits revised to 23; Boring increased to 3,904 LF; Concrete removal/replacement updated to 112. TCP and map have been uploaded as well.
Permit Reviews
Permit Number - TR-UTL-0226-00340
Permit Status: Complete
Permit Description: **REPLACEMENT RECORD FOR TR-UTL-1025-01906 - PRECON CMP 2/18, NO WORK PREVIOUSLY COMPLETED. ARCHAELOGICAL MONITOR COORDINATION BEING DONE UNDER ORIGINAL RECORD**
P.169094C KAHNA
BORE 3859' & TRENCH 60' TO PLACE CONDUIT AND FIBER CABLE. PLACE 24 FLOWER POTS AND 15 PEDESTALS
03/31/26(IEB)-- Rev uploaded: Updated construction quantities and documents. Pedestals/Cabinets/Vaults revised to 42; Splice bore pits revised to 23; Boring increased to 3,904 LF; Concrete removal/replacement updated to 112. TCP and map have been uploaded as well.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/24/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | 04/03/2026 | APPROVED |
| 02/19/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/02/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00340
Permit Status: Complete
Permit Description: **REPLACEMENT RECORD FOR TR-UTL-1025-01906 - PRECON CMP 2/18, NO WORK PREVIOUSLY COMPLETED. ARCHAELOGICAL MONITOR COORDINATION BEING DONE UNDER ORIGINAL RECORD**
P.169094C KAHNA
BORE 3859' & TRENCH 60' TO PLACE CONDUIT AND FIBER CABLE. PLACE 24 FLOWER POTS AND 15 PEDESTALS
03/31/26(IEB)-- Rev uploaded: Updated construction quantities and documents. Pedestals/Cabinets/Vaults revised to 42; Splice bore pits revised to 23; Boring increased to 3,904 LF; Concrete removal/replacement updated to 112. TCP and map have been uploaded as well.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 02/23/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 02/23/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/02/2026 | City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way. |
| 03/02/2026 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 03/02/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 03/02/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00340
Permit Description: **REPLACEMENT RECORD FOR TR-UTL-1025-01906 - PRECON CMP 2/18, NO WORK PREVIOUSLY COMPLETED. ARCHAELOGICAL MONITOR COORDINATION BEING DONE UNDER ORIGINAL RECORD**
P.169094C KAHNA
BORE 3859' & TRENCH 60' TO PLACE CONDUIT AND FIBER CABLE. PLACE 24 FLOWER POTS AND 15 PEDESTALS
03/31/26(IEB)-- Rev uploaded: Updated construction quantities and documents. Pedestals/Cabinets/Vaults revised to 42; Splice bore pits revised to 23; Boring increased to 3,904 LF; Concrete removal/replacement updated to 112. TCP and map have been uploaded as well.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/04/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/04/2026 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 06/04/2026 | TRSP - ROW - Final | Passed |