Permit: TR-UTL-0226-00335
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3455 S WILMOT RD
Address NEW:
3455 S WILMOT RD
Apply Date:
02/19/2026
Applicant:
Cox Communications
Description:
**RELATED FPUP FEES DUE. ISSUE ONCE PAID** PRJ311151-1: Cox to bore 267' to install new CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0226-00335
Permit Status: Complete
Permit Description: **RELATED FPUP FEES DUE. ISSUE ONCE PAID** PRJ311151-1: Cox to bore 267' to install new CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/02/2026 | RIGHT-OF-WAY REVIEW v.2 | 03/04/2026 | REQUIRES RESUBMIT |
| 03/06/2026 | RIGHT-OF-WAY REVIEW v.3 | 03/06/2026 | APPROVED |
| 02/19/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/26/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00335
Permit Status: Complete
Permit Description: **RELATED FPUP FEES DUE. ISSUE ONCE PAID** PRJ311151-1: Cox to bore 267' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/23/2026 | PRE-CON/SIDEWALK |
| 02/23/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/04/2026 | Condition FPUP Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way. |
| 03/04/2026 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 03/04/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00335
Permit Description: **RELATED FPUP FEES DUE. ISSUE ONCE PAID** PRJ311151-1: Cox to bore 267' to install new CATV conduit for system tie.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | walk-through on site of boring route, sidewalk will not be affected by barricade set up, so no alternate route required. First day mobilization will be next inspection for barricade set up. | |
| 06/26/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | all devices removed from site | |
| 06/26/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | all work performed in landscape area completed, backfilled and compacted, approved | |
| 06/26/2026 | TRSP - ROW - Final | Passed | all trench/ bore work completed, traffic control devices removed from site, approved |