Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5841 E 24TH ST
Address NEW:
5841 E 24TH ST
Apply Date:
02/19/2026
Applicant:
Esteban Vega - Desert Barricades
Description:
WO T159031. Crews to park in the City of Tucson ROW to replace (16) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. 05/20/26-Renew permit for 90 days as of 05/26/2026 new experation date is 08/24/26.

Permit Reviews

Permit Number - TR-UTL-0226-00330
Permit Status: Complete
Permit Description: WO T159031. Crews to park in the City of Tucson ROW to replace (16) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. 05/20/26-Renew permit for 90 days as of 05/26/2026 new experation date is 08/24/26.
Start Date Submittal Complete Date Status  
02/19/2026 RIGHT-OF-WAY REVIEW v.1 02/20/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0226-00330
Permit Status: Complete
Permit Description: WO T159031. Crews to park in the City of Tucson ROW to replace (16) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. 05/20/26-Renew permit for 90 days as of 05/26/2026 new experation date is 08/24/26.
Total Outstanding Activity Conditions - 6
Date Name
02/19/2026 Traffic control set-up approved between 9AM - 3:30PM
02/20/2026 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
02/20/2026 Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
02/20/2026 City of Tucson Right of Way Only ROW Permit is only allowed for work within City of Tucson Right of Way.
02/20/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
02/20/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0226-00330
Permit Description: WO T159031. Crews to park in the City of Tucson ROW to replace (16) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. 05/20/26-Renew permit for 90 days as of 05/26/2026 new experation date is 08/24/26.
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/25/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Spoke with Villasenor from TEP for pre con
05/26/2026 TRSP - ROW - Barricade - Setup/Routine Passed all traffic control devices removed from site, travel lane and alleyways are open
08/18/2026 TRSP - ROW - Backfill - Placement/Compaction Passed final pole and anchor installation completed, backfilled in alleyway landscape
08/18/2026 TRSP - ROW - Final Passed last pole installed, alleyway open and clear of debris, approved

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DB 72031 - 5841 E 24TH ST - VARIOUS - T159031_V1.PDF DOCUMENTS VIEW
T159031 - CRAYCROFT PH2A - AERIAL PERMIT MAP_V1.PDF DOCUMENTS VIEW