Permit: TR-UTL-0226-00318
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2884 E GANLEY RD
Address NEW:
2884 E GANLEY RD
Apply Date:
02/18/2026
Applicant:
Cox Communications
Description:
PRJ310715-1: Cox to pull thru 6' of existing CATV conduit, overlash 53' of existing CATV aerial strand and bore 18' to install new CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0226-00318
Permit Status: Complete
Permit Description: PRJ310715-1: Cox to pull thru 6' of existing CATV conduit, overlash 53' of existing CATV aerial strand and bore 18' to install new CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/18/2026 | RIGHT-OF-WAY REVIEW v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00318
Permit Status: Complete
Permit Description: PRJ310715-1: Cox to pull thru 6' of existing CATV conduit, overlash 53' of existing CATV aerial strand and bore 18' to install new CATV conduit for system tie.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/19/2026 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 02/19/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00318
Permit Description: PRJ310715-1: Cox to pull thru 6' of existing CATV conduit, overlash 53' of existing CATV aerial strand and bore 18' to install new CATV conduit for system tie.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 06/11/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 06/11/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/11/2026 | TRSP - ROW - Final | Passed |