Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Approved
Type:
Right-of-Way (ROW) - Utility
Address NEW:
2616 N COLUMBUS BL
Apply Date:
02/18/2026
Applicant:
Adrien Pineda
Description:
***HOLD WAITING ON **FUP**90 DYAS* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 2616 N COLUMBUS BLVD

Permit Reviews

Permit Number - TR-UTL-0226-00316
Permit Status: Approved
Permit Description: ***HOLD WAITING ON **FUP**90 DYAS* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 2616 N COLUMBUS BLVD
Start Date Submittal Complete Date Status  
02/18/2026 RIGHT-OF-WAY REVIEW v.1 03/02/2026 REQUIRES RESUBMIT Review Details
03/02/2026 RIGHT-OF-WAY REVIEW v.2 03/03/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0226-00316
Permit Status: Approved
Permit Description: ***HOLD WAITING ON **FUP**90 DYAS* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 2616 N COLUMBUS BLVD
Total Outstanding Activity Conditions - 6
Date Name
02/19/2026 Traffic control set-up approved between 9AM - 3:30PM
03/02/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
03/02/2026 Condition FPUP Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way.
03/02/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
03/02/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
03/02/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property

Documents

File Name Document Type  
2616 N COLUMBUS BL SITE_V1.PDF DOCUMENTS VIEW
2616 N COLUMBUS BL TCP REVISED_V2.PDF DOCUMENTS VIEW