Permit: TR-UTL-0226-00314
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
2505 E 1ST ST
Address NEW:
2505 E 1ST ST
Apply Date:
02/18/2026
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop front for crews to repair gas line
Permit Reviews
Permit Number - TR-UTL-0226-00314
Permit Status: Inspections
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas line
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/18/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/20/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00314
Permit Status: Inspections
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas line
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/19/2026 | PAVEMENT MORATORIUM: ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 02/19/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/20/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 02/20/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 02/20/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0226-00314
Permite Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas line
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2026 | TRSP - ROW - Final | N/A | Re-inspection required | Current patch is heaving and has caused a bump within the bike lane. Patch will need to be replaced. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0226-00314
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair gas line
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Meet on-site with Lee and Jose from SWG, they are going to use a core machine and seal the plug in afterwards, 100% AB backfill instead of slurry. |