Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
02/17/2026
Applicant:
Adrien Pineda
Description:
*90 DAYS* ARIZXONA PIPELINE CO WILL NEED TO EXCAVATE (2) 5X5 BELL HOLE IN CONCRETE SIDEWALK ALONG WITH (1)30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 6250 S COMMERCE COURT

Permit Reviews

Permit Number - TR-UTL-0226-00311
Permit Status: Complete
Permit Description: *90 DAYS* ARIZXONA PIPELINE CO WILL NEED TO EXCAVATE (2) 5X5 BELL HOLE IN CONCRETE SIDEWALK ALONG WITH (1)30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 6250 S COMMERCE COURT
Start Date Submittal Complete Date Status  
02/17/2026 RIGHT-OF-WAY REVIEW v.1 02/23/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0226-00311
Permit Status: Complete
Permit Description: *90 DAYS* ARIZXONA PIPELINE CO WILL NEED TO EXCAVATE (2) 5X5 BELL HOLE IN CONCRETE SIDEWALK ALONG WITH (1)30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 6250 S COMMERCE COURT
Total Outstanding Activity Conditions - 5
Date Name
02/23/2026 Traffic Control set-up approved between 7AM - 5PM
02/23/2026 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
02/23/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
02/23/2026 Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
02/23/2026 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0226-00311
Permit Description: *90 DAYS* ARIZXONA PIPELINE CO WILL NEED TO EXCAVATE (2) 5X5 BELL HOLE IN CONCRETE SIDEWALK ALONG WITH (1)30X3 TRENCH ACROSS ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 6250 S COMMERCE COURT
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/02/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/22/2026 TRSP - ROW - Barricade - Setup/Routine Passed
05/22/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
05/28/2026 TRSP - ROW - Final Passed