Permit: TR-UTL-0226-00297
Permit Details
Status:
Expired
Type:
Right-of-Way (ROW) - Utility
Address:
7802 E VANCOUVER PL
Address NEW:
7802 E VANCOUVER PL
Apply Date:
02/13/2026
Applicant:
ANGEL MORALES
Description:
P.092668F BORE 3695' AND TRENCH 110' TO PLACE CONDUIT AND FIBER CABLE PLACE 27 PEDESTALS AND HAND HOLES 06/02/2026 - Request for 90 Day Renewal as of 06/04/2026
Permit Reviews
Permit Number - TR-UTL-0226-00297
Permit Status: Expired
Permit Description: P.092668F
BORE 3695' AND TRENCH 110' TO PLACE CONDUIT AND FIBER CABLE
PLACE 27 PEDESTALS AND HAND HOLES
06/02/2026 - Request for 90 Day Renewal as of 06/04/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/02/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00297
Permit Status: Expired
Permit Description: P.092668F
BORE 3695' AND TRENCH 110' TO PLACE CONDUIT AND FIBER CABLE
PLACE 27 PEDESTALS AND HAND HOLES
06/02/2026 - Request for 90 Day Renewal as of 06/04/2026
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/19/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 02/19/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 02/19/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Expired
Permit Number: TR-UTL-0226-00297
Permit Description: P.092668F
BORE 3695' AND TRENCH 110' TO PLACE CONDUIT AND FIBER CABLE
PLACE 27 PEDESTALS AND HAND HOLES
06/02/2026 - Request for 90 Day Renewal as of 06/04/2026
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | covered in pre-con for permit A | |
| 08/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | alleyways open, devices removed | |
| 08/27/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | all backfill in alleyway landscapes completed | |
| 08/27/2026 | TRSP - ROW - Final | Passed | all backfill completed for alleyway work, traffic control devices removed from site, approved |