Permit: TR-UTL-0226-00296
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7611 E QUEEN PALM PL
Address NEW:
7611 E QUEEN PALM PL
Apply Date:
02/13/2026
Applicant:
ANGEL MORALES
Description:
P.092668E BORE 4883' AND TRENCH 246' TO PLACE CONDUIT AND FIBER CABLE PLACE 52 PEDESTALS AND HAND HOLES 05/29/26- Renew for 90 days as of 06/04/26, new expiration date is 09/02/26
Permit Reviews
Permit Number - TR-UTL-0226-00296
Permit Status: Complete
Permit Description: P.092668E
BORE 4883' AND TRENCH 246' TO PLACE CONDUIT AND FIBER CABLE
PLACE 52 PEDESTALS AND HAND HOLES
05/29/26- Renew for 90 days as of 06/04/26, new expiration date is 09/02/26
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/02/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00296
Permit Status: Complete
Permit Description: P.092668E
BORE 4883' AND TRENCH 246' TO PLACE CONDUIT AND FIBER CABLE
PLACE 52 PEDESTALS AND HAND HOLES
05/29/26- Renew for 90 days as of 06/04/26, new expiration date is 09/02/26
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/19/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 02/19/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 02/19/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/02/2026 | If survey markers are damaged and/or disturbed during construction, the contractor shall have the marker reset by a registered Land Surveyor. According to state law (ARS 33-103) |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00296
Permit Description: P.092668E
BORE 4883' AND TRENCH 246' TO PLACE CONDUIT AND FIBER CABLE
PLACE 52 PEDESTALS AND HAND HOLES
05/29/26- Renew for 90 days as of 06/04/26, new expiration date is 09/02/26
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | covered in pre-con for permit A | |
| 06/08/2026 | TRSP - ROW - SITE INSPECTION | Passed | on site meeting with Pauley and quantum, redline route to be adopted, using vacant beauty strips. Cul-de-sac crossing will be a single bore line, pothole all utility crossings. Multiple cuts will be restored with single patch, curb face to curb face. | |
| 08/28/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | all traffic control devices removed | |
| 08/28/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | alleyway landscape backfilled with native | |
| 08/28/2026 | TRSP - ROW - Final | Passed | all inspections completed, site clear of debris and devices |