Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
7711 E WINNEPEG DR
Apply Date:
02/13/2026
Applicant:
ANGEL MORALES
Description:
P.092668D BORE 3662' AND TRENCH 187' TO PLACE CONDUIT AND FIBER CABLE PLACE 37 PEDESTALS & HAND HOLES 05/29/26- Renew for 90 days as of 06/04/26, new expiration date is 09/02/26

Permit Reviews

Permit Number - TR-UTL-0226-00295
Permit Status: Complete
Permit Description: P.092668D BORE 3662' AND TRENCH 187' TO PLACE CONDUIT AND FIBER CABLE PLACE 37 PEDESTALS & HAND HOLES 05/29/26- Renew for 90 days as of 06/04/26, new expiration date is 09/02/26
Start Date Submittal Complete Date Status  
02/17/2026 RIGHT-OF-WAY REVIEW v.1 03/02/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0226-00295
Permit Status: Complete
Permit Description: P.092668D BORE 3662' AND TRENCH 187' TO PLACE CONDUIT AND FIBER CABLE PLACE 37 PEDESTALS & HAND HOLES 05/29/26- Renew for 90 days as of 06/04/26, new expiration date is 09/02/26
Total Outstanding Activity Conditions - 3
Date Name
02/19/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
02/19/2026 Traffic Control set-up approved between 7AM - 5PM
02/19/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0226-00295
Permit Description: P.092668D BORE 3662' AND TRENCH 187' TO PLACE CONDUIT AND FIBER CABLE PLACE 37 PEDESTALS & HAND HOLES 05/29/26- Renew for 90 days as of 06/04/26, new expiration date is 09/02/26
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/08/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed approved, barricade set up to be called in next once start date is determined
08/28/2026 TRSP - ROW - Barricade - Setup/Routine Passed barricades removed from site
08/28/2026 TRSP - ROW - Backfill - Placement/Compaction Passed bore pits and new equipment backfilled in alleyways and landscape areas
08/28/2026 TRSP - ROW - Final Passed all inspections passed, site is clear of devices and debris, approved

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
CENTURY LINK - P.092668-D - COMBINED D_V1.PDF DOCUMENTS VIEW
P.092668 AERIAL PERMIT D_V1.PDF DOCUMENTS VIEW
P.092668 CIVIL PERMIT D_V1.PDF DOCUMENTS VIEW