Permit: TR-UTL-0226-00289
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7521 E LAKESIDE DR
Address NEW:
7521 E LAKESIDE DR
Apply Date:
02/13/2026
Applicant:
ANGEL MORALES
Description:
P.092668B BORE 2301' AND TRENCH 273' TO PLACE CONDUIT AND FIBER CABLE PLACE 383' OF AERIAL FIBER CABLE PLACE 9 PEDESTALS AND 23 HAND HOLES 05/29/26- Renew for 90 days as of 06/04/26 new expiration date is 09/02/26.
Permit Reviews
Permit Number - TR-UTL-0226-00289
Permit Status: Complete
Permit Description: P.092668B
BORE 2301' AND TRENCH 273' TO PLACE CONDUIT AND FIBER CABLE
PLACE 383' OF AERIAL FIBER CABLE
PLACE 9 PEDESTALS AND 23 HAND HOLES
05/29/26- Renew for 90 days as of 06/04/26 new expiration date is 09/02/26.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/27/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00289
Permit Status: Complete
Permit Description: P.092668B
BORE 2301' AND TRENCH 273' TO PLACE CONDUIT AND FIBER CABLE
PLACE 383' OF AERIAL FIBER CABLE
PLACE 9 PEDESTALS AND 23 HAND HOLES
05/29/26- Renew for 90 days as of 06/04/26 new expiration date is 09/02/26.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 02/27/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 02/27/2026 | LOCAL - subject to a pavement moratorium. A 2-inch mill and overlay, covering half the width of the roadway, is required. The ROW inspector will confirm the treatment required for pavement restoration at the preconstruction meeting |
| 02/27/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/27/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property |
| 02/27/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 02/27/2026 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00289
Permit Description: P.092668B
BORE 2301' AND TRENCH 273' TO PLACE CONDUIT AND FIBER CABLE
PLACE 383' OF AERIAL FIBER CABLE
PLACE 9 PEDESTALS AND 23 HAND HOLES
05/29/26- Renew for 90 days as of 06/04/26 new expiration date is 09/02/26.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | covered in pre-con for permit A | |
| 08/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | all work completed, devices removed from site | |
| 08/27/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | all backfill completed in landscape alleyways | |
| 08/27/2026 | TRSP - ROW - AERIAL INSTALLATION | Passed | aerial work and risers completed along Prudence | |
| 08/27/2026 | TRSP - ROW - Final | Passed | all other inspections completed, site clear of debris and devices, approved |