Permit: TR-UTL-0226-00286
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
7500 E STELLA RD
Address NEW:
7500 E STELLA RD
Apply Date:
02/13/2026
Applicant:
ANGEL MORALES
Description:
P.092668A BORE 3158' AND TRENCH 310' TO PLACE CONDUIT AND FIBER CABLE PLACE 1155' OF AERIAL FIBER CABLE PLACE 9 PEDESTALS AND 34 HAND HOLES 06/12/2026 - Request for 90 Day Renewal as of 06/17/2026
Permit Reviews
Permit Number - TR-UTL-0226-00286
Permit Status: Issued
Permit Description: P.092668A
BORE 3158' AND TRENCH 310' TO PLACE CONDUIT AND FIBER CABLE
PLACE 1155' OF AERIAL FIBER CABLE
PLACE 9 PEDESTALS AND 34 HAND HOLES
06/12/2026 - Request for 90 Day Renewal as of 06/17/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/17/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/02/2026 | REQUIRES RESUBMIT |
| 03/06/2026 | RIGHT-OF-WAY REVIEW v.2 | 03/06/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00286
Permit Status: Issued
Permit Description: P.092668A
BORE 3158' AND TRENCH 310' TO PLACE CONDUIT AND FIBER CABLE
PLACE 1155' OF AERIAL FIBER CABLE
PLACE 9 PEDESTALS AND 34 HAND HOLES
06/12/2026 - Request for 90 Day Renewal as of 06/17/2026
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 02/18/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns |
| 02/18/2026 | IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 02/27/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 02/27/2026 | |
| 02/27/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 02/27/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/27/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-UTL-0226-00286
Permite Description: P.092668A
BORE 3158' AND TRENCH 310' TO PLACE CONDUIT AND FIBER CABLE
PLACE 1155' OF AERIAL FIBER CABLE
PLACE 9 PEDESTALS AND 34 HAND HOLES
06/12/2026 - Request for 90 Day Renewal as of 06/17/2026
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Complete (Recurring) | streets are clear of signs, cones present in alleyway |
| 06/12/2026 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Complete (Recurring) | work is still in progress, conduits are not completed in alleyway between Fayette and 45th |
| 06/12/2026 | TRSP - ROW - AERIAL INSTALLATION | N/A | Complete (Recurring) | overhead run completed, awaiting secondary installation scheduled for 6/15. |
| 06/12/2026 | TRSP - ROW - Final | N/A | Not Ready | work is still in progress with more alleyway work and aerial secondaries to finish |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0226-00286
Permit Description: P.092668A
BORE 3158' AND TRENCH 310' TO PLACE CONDUIT AND FIBER CABLE
PLACE 1155' OF AERIAL FIBER CABLE
PLACE 9 PEDESTALS AND 34 HAND HOLES
06/12/2026 - Request for 90 Day Renewal as of 06/17/2026
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | review of scope of work, start date, TBD, Thomas with Pauley to call in traffic control barricade set up on first day |