Permit: TR-UTL-0226-00278
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
3733 S JESSICA AV
Address NEW:
3733 S JESSICA AV
Apply Date:
02/13/2026
Applicant:
ANGEL MORALES
Description:
P.092665D BORE 2479' AND TRENCH 307' TO PLACE CONDUIT AND FIBER CABLE PLACE 1270' OF AERIAL FIBER CABLE PLACE 11 PEDESTALS AND 31 HAND HOLES
Permit Reviews
Permit Number - TR-UTL-0226-00278
Permit Status: Issued
Permit Description: P.092665D
BORE 2479' AND TRENCH 307' TO PLACE CONDUIT AND FIBER CABLE
PLACE 1270' OF AERIAL FIBER CABLE
PLACE 11 PEDESTALS AND 31 HAND HOLES
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/13/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/26/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00278
Permit Status: Issued
Permit Description: P.092665D
BORE 2479' AND TRENCH 307' TO PLACE CONDUIT AND FIBER CABLE
PLACE 1270' OF AERIAL FIBER CABLE
PLACE 11 PEDESTALS AND 31 HAND HOLES
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 02/17/2026 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 02/17/2026 | IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 02/17/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/17/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 02/17/2026 | See attachment for storm to shade conditions. |
| 02/18/2026 | Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 02/18/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 02/18/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/18/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property |