Permit: TR-UTL-0226-00271
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4875 S ALBACETE AV
Address NEW:
4875 S ALBACETE AV
Apply Date:
02/12/2026
Applicant:
ANGEL MORALES
Description:
P.169111B (KAHNA) - BORE 2,501 ' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE, (12) PEDESTALS. THIS PERMIT IS TO REPLACE Permit Number: TR-UTL-0925-01475, WORK DID NOT BEGIN BEFORE EXPIRATION DATE
Permit Reviews
Permit Number - TR-UTL-0226-00271
Permit Status: Complete
Permit Description: P.169111B (KAHNA) - BORE 2,501 ' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE, (12) PEDESTALS.
THIS PERMIT IS TO REPLACE Permit Number: TR-UTL-0925-01475, WORK DID NOT BEGIN BEFORE EXPIRATION DATE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2026 | RIGHT-OF-WAY REVIEW v.1 | 03/11/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00271
Permit Status: Complete
Permit Description: P.169111B (KAHNA) - BORE 2,501 ' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE, (12) PEDESTALS.
THIS PERMIT IS TO REPLACE Permit Number: TR-UTL-0925-01475, WORK DID NOT BEGIN BEFORE EXPIRATION DATE
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/17/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 02/17/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 02/17/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 02/23/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/23/2026 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00271
Permit Description: P.169111B (KAHNA) - BORE 2,501 ' TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (1) HANDHOLE, (12) PEDESTALS.
THIS PERMIT IS TO REPLACE Permit Number: TR-UTL-0925-01475, WORK DID NOT BEGIN BEFORE EXPIRATION DATE
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/18/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/18/2026 | TRSP - ROW - Final | Passed | ||
| 05/18/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/18/2026 | TRSP - ROW - SITE INSPECTION | Passed |