Permit: TR-UTL-0226-00258
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
4774 S GOLDENROD PL
Address NEW:
4774 S GOLDENROD PL
Apply Date:
02/11/2026
Applicant:
ANGEL MORALES
Description:
P.092922G KAHNA BORE 4731' AND TRENCH 288' TO PLACE CONDUIT AND FIBER CABLE PLACE 12 PEDESTALS AND 48 HAND HOLES
Permit Reviews
Permit Number - TR-UTL-0226-00258
Permit Status: Complete
Permit Description: P.092922G KAHNA
BORE 4731' AND TRENCH 288' TO PLACE CONDUIT AND FIBER CABLE
PLACE 12 PEDESTALS AND 48 HAND HOLES
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/11/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/25/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00258
Permit Status: Complete
Permit Description: P.092922G KAHNA
BORE 4731' AND TRENCH 288' TO PLACE CONDUIT AND FIBER CABLE
PLACE 12 PEDESTALS AND 48 HAND HOLES
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/13/2026 | ALLEY |
| 02/13/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 02/25/2026 | All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 02/25/2026 | The contractor shall coordinate all work activities, including scheduling and traffic control, with the active Southwest Gas (SWG) project currently operating within the same neighborhood to avoid conflicts and ensure public safety |
| 02/25/2026 | Work shall be completed prior to January 2027 for repaving project scheduled for Groves neighborhood. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00258
Permit Description: P.092922G KAHNA
BORE 4731' AND TRENCH 288' TO PLACE CONDUIT AND FIBER CABLE
PLACE 12 PEDESTALS AND 48 HAND HOLES
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/03/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | all underground work performed in landscape alleyway areas, backfilled and compacted, approved | |
| 06/03/2026 | TRSP - ROW - Final | Passed | trench backfilling completed, alleyway traffic control removed, all work completed, approved |