Permit: TR-UTL-0226-00243
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
253 N DESERT PARK PL
Address NEW:
253 N DESERT PARK PL
Apply Date:
02/10/2026
Applicant:
Adrien Pineda
Description:
*90 DAYS * ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON AN UNUSED GAS STUB
Permit Reviews
Permit Number - TR-UTL-0226-00243
Permit Status: Complete
Permit Description: *90 DAYS *
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON AN UNUSED GAS STUB
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/10/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/12/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00243
Permit Status: Complete
Permit Description: *90 DAYS *
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON AN UNUSED GAS STUB
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/12/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 02/12/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. jose.garcia@tucsonaz.gov Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts. |
| 02/12/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 02/12/2026 | Traffic control set-up approved between 9AM - 3:30PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00243
Permite Description: *90 DAYS *
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON AN UNUSED GAS STUB
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2026 | TRSP - ROW - Final | N/A | Re-inspection required | permit patch still needs to be installed in the bike lane |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0226-00243
Permit Description: *90 DAYS *
ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON AN UNUSED GAS STUB
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/19/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/14/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/14/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | permit patch still needs to be installed in the bike lane | |
| 07/15/2026 | TRSP - ROW - Final | Passed |