Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
253 N DESERT PARK PL
Apply Date:
02/10/2026
Applicant:
Adrien Pineda
Description:
*90 DAYS * ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON AN UNUSED GAS STUB

Permit Reviews

Permit Number - TR-UTL-0226-00243
Permit Status: Complete
Permit Description: *90 DAYS * ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON AN UNUSED GAS STUB
Start Date Submittal Complete Date Status  
02/10/2026 RIGHT-OF-WAY REVIEW v.1 02/12/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0226-00243
Permit Status: Complete
Permit Description: *90 DAYS * ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON AN UNUSED GAS STUB
Total Outstanding Activity Conditions - 4
Date Name
02/12/2026 Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign.
02/12/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. jose.garcia@tucsonaz.gov Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 48 business hours before beginning work to coordinate impacts.
02/12/2026 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
02/12/2026 Traffic control set-up approved between 9AM - 3:30PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0226-00243
Permite Description: *90 DAYS * ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON AN UNUSED GAS STUB
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/14/2026 TRSP - ROW - Final N/A Re-inspection required permit patch still needs to be installed in the bike lane

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0226-00243
Permit Description: *90 DAYS * ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON AN UNUSED GAS STUB
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/19/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/14/2026 TRSP - ROW - Barricade - Setup/Routine Passed
05/14/2026 TRSP - ROW - Backfill - Placement/Compaction Passed permit patch still needs to be installed in the bike lane
07/15/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
253 N DESERT PARK PL SITE_V1.PDF DOCUMENTS VIEW
253 N DESERT PARK PL TCP_V1.PDF DOCUMENTS VIEW