Permit: TR-UTL-0226-00226
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
115 N EUCLID AV
Address NEW:
115 N EUCLID AV
Apply Date:
02/06/2026
Applicant:
Aidan Willis
Description:
Zayo (ADB Companies) to install conduit/fiber along City of Tucson ROW for an estimated 5,024 LF. Zayo Handholes to be installed every 2,000 LF.
Permit Reviews
Permit Number - TR-UTL-0226-00226
Permit Status: Issued
Permit Description: Zayo (ADB Companies) to install conduit/fiber along City of Tucson ROW for an estimated 5,024 LF. Zayo Handholes to be installed every 2,000 LF.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/17/2026 | RIGHT-OF-WAY REVIEW v.2 | 02/17/2026 | APPROVED |
| 02/06/2026 | RIGHT-OF-WAY REVIEW v.1 | 02/11/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0226-00226
Permit Status: Issued
Permit Description: Zayo (ADB Companies) to install conduit/fiber along City of Tucson ROW for an estimated 5,024 LF. Zayo Handholes to be installed every 2,000 LF.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 02/10/2026 | Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination. |
| 02/10/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/10/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 02/10/2026 | IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 02/17/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 02/17/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/17/2026 | Rolling Traffic Control Closures Law Enforcement Point Control Required at All crossing of Signalized or Major Intersections Rolling Closure to Require Cone placement for extended Static Work Pre-Warning Signing to include Road Work Ahead, w/Right Lane Closed Ahead on Truck for Stand by Flagman to be used for Side roads for Static Work locations |