Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
1001 N 3RD AV
Address NEW:
1001 N 3RD AV
Apply Date:
02/06/2026
Applicant:
Trafficade service /AWP Safety Jamie Hoyt
Description:
Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 5,258 LF along City of Tucson ROW. Zayo Handholes to be installed every 2,000 LF for future maintenance and access.

Permit Reviews

Permit Number - TR-UTL-0226-00225
Permit Status: Needs resubmittal
Permit Description: Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 5,258 LF along City of Tucson ROW. Zayo Handholes to be installed every 2,000 LF for future maintenance and access.
Start Date Submittal Complete Date Status  
02/06/2026 RIGHT-OF-WAY REVIEW v.1 02/11/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0226-00225
Permit Status: Needs resubmittal
Permit Description: Zayo Contractor (ADB companies) to install conduit/fiber via directional bore and trench for an estimated 5,258 LF along City of Tucson ROW. Zayo Handholes to be installed every 2,000 LF for future maintenance and access.
Total Outstanding Activity Conditions - 3
Date Name
02/10/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
02/10/2026 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14
02/10/2026 Traffic control set-up approved between 9AM - 3:30PM