Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3985 N STONE AV BLDG A
Apply Date:
02/27/2025
Applicant:
Cox Communications
Description:
Cox to Pothole to intercept Coax Cable/Conduit and set a PED, then Riser up new pole. and complete Straight Pole Transfer for Service Repair order

Permit Reviews

Permit Number - TR-UTL-0225-00354
Permit Status: Complete
Permit Description: Cox to Pothole to intercept Coax Cable/Conduit and set a PED, then Riser up new pole. and complete Straight Pole Transfer for Service Repair order
Start Date Submittal Complete Date Status  
03/13/2025 RIGHT-OF-WAY REVIEW v.2 03/18/2025 REQUIRES RESUBMIT Review Details
02/28/2025 RIGHT-OF-WAY REVIEW v.1 03/05/2025 REQUIRES RESUBMIT Review Details
03/21/2025 RIGHT-OF-WAY REVIEW v.3 03/21/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0225-00354
Permit Status: Complete
Permit Description: Cox to Pothole to intercept Coax Cable/Conduit and set a PED, then Riser up new pole. and complete Straight Pole Transfer for Service Repair order
Total Outstanding Activity Conditions - 2
Date Name
03/05/2025 Traffic control set-up approved between 9AM - 3:30PM
03/05/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0225-00354
Permit Description: Cox to Pothole to intercept Coax Cable/Conduit and set a PED, then Riser up new pole. and complete Straight Pole Transfer for Service Repair order
Total Completed Inspections - 6
Date Description Inspector Results Comments
04/22/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/24/2025 TRSP - ROW - Barricade - Setup/Routine Passed
05/12/2025 TRSP - ROW - Barricade Takedown Passed
05/12/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
05/12/2025 TRSP - ROW - AERIAL INSTALLATION Passed
05/14/2025 TRSP - ROW - Final Passed