Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1735 W SPEEDWAY BL
Apply Date:
02/25/2025
Applicant:
JUAN PEREZ
Description:
Excavating a 30' x3' trench to abandon gas line service in row in asphalt and dirt. Permit update 4/10/2025: Renewed for 30 days.

Permit Reviews

Permit Number - TR-UTL-0225-00334
Permit Status: Complete
Permit Description: Excavating a 30' x3' trench to abandon gas line service in row in asphalt and dirt. Permit update 4/10/2025: Renewed for 30 days.
Start Date Submittal Complete Date Status  
02/27/2025 RIGHT-OF-WAY REVIEW v.1 03/03/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0225-00334
Permit Status: Complete
Permit Description: Excavating a 30' x3' trench to abandon gas line service in row in asphalt and dirt. Permit update 4/10/2025: Renewed for 30 days.
Total Outstanding Activity Conditions - 6
Date Name
02/28/2025 Traffic control set-up approved between 9AM - 3:30PM
03/03/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION
03/03/2025 Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE.
03/03/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
03/03/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
03/03/2025 Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0225-00334
Permit Description: Excavating a 30' x3' trench to abandon gas line service in row in asphalt and dirt. Permit update 4/10/2025: Renewed for 30 days.
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/07/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/08/2025 TRSP - ROW - Final Passed
05/02/2025 TRSP - ROW - Barricade - Setup/Routine Passed
05/02/2025 TRSP - ROW - Backfill - Placement/Compaction Passed