Permit: TR-UTL-0225-00307
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3701 E SPEEDWAY BL
Address NEW:
3701 E SPEEDWAY BL
Apply Date:
02/19/2025
Applicant:
Description:
Remove and replace approximately 200SF of asphalt at trench location. Repair broken sewer pipe in first West bound travel lane. (Work has been completed as emergency, per Laurie at Dusty Dudes Excavation)
Permit Reviews
Permit Number - TR-UTL-0225-00307
Permit Status: Complete
Permit Description: Remove and replace approximately 200SF of asphalt at trench location.
Repair broken sewer pipe in first West bound travel lane. (Work has been completed as emergency, per Laurie at Dusty Dudes Excavation)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/04/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0225-00307
Permit Status: Complete
Permit Description: Remove and replace approximately 200SF of asphalt at trench location.
Repair broken sewer pipe in first West bound travel lane. (Work has been completed as emergency, per Laurie at Dusty Dudes Excavation)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/27/2025 | EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address because DTM did not have an opportunity to review, approve, or inspect the work. |
| 02/27/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/27/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 02/27/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0225-00307
Permit Description: Remove and replace approximately 200SF of asphalt at trench location.
Repair broken sewer pipe in first West bound travel lane. (Work has been completed as emergency, per Laurie at Dusty Dudes Excavation)
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 03/13/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 03/13/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/13/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 03/13/2025 | TRSP - ROW - Final | Passed |