Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3701 E SPEEDWAY BL
Apply Date:
02/19/2025
Applicant:
Description:
Remove and replace approximately 200SF of asphalt at trench location. Repair broken sewer pipe in first West bound travel lane. (Work has been completed as emergency, per Laurie at Dusty Dudes Excavation)

Permit Reviews

Permit Number - TR-UTL-0225-00307
Permit Status: Complete
Permit Description: Remove and replace approximately 200SF of asphalt at trench location. Repair broken sewer pipe in first West bound travel lane. (Work has been completed as emergency, per Laurie at Dusty Dudes Excavation)
Start Date Submittal Complete Date Status  
02/24/2025 RIGHT-OF-WAY REVIEW v.1 03/04/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0225-00307
Permit Status: Complete
Permit Description: Remove and replace approximately 200SF of asphalt at trench location. Repair broken sewer pipe in first West bound travel lane. (Work has been completed as emergency, per Laurie at Dusty Dudes Excavation)
Total Outstanding Activity Conditions - 4
Date Name
02/27/2025 EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address because DTM did not have an opportunity to review, approve, or inspect the work.
02/27/2025 Traffic control set-up approved between 9AM - 3:30PM
02/27/2025 PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
02/27/2025 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0225-00307
Permit Description: Remove and replace approximately 200SF of asphalt at trench location. Repair broken sewer pipe in first West bound travel lane. (Work has been completed as emergency, per Laurie at Dusty Dudes Excavation)
Total Completed Inspections - 5
Date Description Inspector Results Comments
03/13/2025 TRSP - ROW - Barricade - Setup/Routine Passed
03/13/2025 TRSP - ROW - Paving - Subgrade/removal/placement Passed
03/13/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/13/2025 TRSP - ROW - Barricade Takedown Passed
03/13/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
3701 E SPEEDAY - GIS_V1.PDF DOCUMENTS VIEW
TRAFFICADE 3701 E SPEEDWAY DISCOUNT TIRE_V1.PDF DOCUMENTS VIEW