Permit: TR-UTL-0225-00305
Permit Details
Apply Date:
02/19/2025
Applicant:
Cox Communications
Description:
PRJ283533-2 COX TO PROOF & PULL 87' FT THRU EXISTING CONDUIT FOR SYSTEM TIE.
Permit Reviews
Permit Number - TR-UTL-0225-00305
Permit Status: Complete
Permit Description: PRJ283533-2 COX TO PROOF & PULL 87' FT THRU EXISTING CONDUIT FOR SYSTEM TIE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0225-00305
Permit Status: Complete
Permit Description: PRJ283533-2 COX TO PROOF & PULL 87' FT THRU EXISTING CONDUIT FOR SYSTEM TIE.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/27/2025 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 02/27/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 02/27/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0225-00305
Permit Description: PRJ283533-2 COX TO PROOF & PULL 87' FT THRU EXISTING CONDUIT FOR SYSTEM TIE.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/19/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 06/05/2025 | TRSP - ROW - Final | Passed |