Permit: TR-UTL-0225-00302
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
528 N EL CAMINO DEL NORTE
Address NEW:
528 N EL CAMINO DEL NORTE
Apply Date:
02/19/2025
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop front for crews to repair grade 2 gas leak
Permit Reviews
Permit Number - TR-UTL-0225-00302
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair grade 2 gas leak
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/24/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/27/2025 | REQUIRES RESUBMIT |
| 02/28/2025 | RIGHT-OF-WAY REVIEW v.2 | 02/28/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0225-00302
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair grade 2 gas leak
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 02/26/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 02/26/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/28/2025 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE. |
| 02/28/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0225-00302
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair grade 2 gas leak
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 05/06/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/06/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/06/2025 | TRSP - ROW - Final | Passed |