Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
02/19/2025
Applicant:
Kristine Schwartz
Description:
2 5x5 bellholes in dirt/blktop front for crews to repair grade 2 gas leak

Permit Reviews

Permit Number - TR-UTL-0225-00302
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair grade 2 gas leak
Start Date Submittal Complete Date Status  
02/24/2025 RIGHT-OF-WAY REVIEW v.1 02/27/2025 REQUIRES RESUBMIT Review Details
02/28/2025 RIGHT-OF-WAY REVIEW v.2 02/28/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0225-00302
Permit Status: Complete
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair grade 2 gas leak
Total Outstanding Activity Conditions - 4
Date Name
02/26/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
02/26/2025 Traffic control set-up approved between 9AM - 3:30PM
02/28/2025 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED . SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS IF LOCATED WITHIN 660' OF CLOSURE. PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO ADA RAMPS ACCESSABLE.
02/28/2025 Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0225-00302
Permit Description: 2 5x5 bellholes in dirt/blktop front for crews to repair grade 2 gas leak
Total Completed Inspections - 4
Date Description Inspector Results Comments
03/05/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/06/2025 TRSP - ROW - Barricade - Setup/Routine Passed
05/06/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
05/06/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
528 N EL CAMINO DEL NORTE SITE PLAN_V1.PDF DOCUMENTS VIEW
528 N EL CAMINO DEL NORTE- REVISED_V2.PDF DOCUMENTS VIEW