Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
532 N 1ST AV
Address NEW:
532 N 1ST AV
Apply Date:
02/19/2025
Applicant:
JUAN PEREZ
Description:
Excavating a 60'x3' trench to replace gas line service in row in asphalt and dirt.

Permit Reviews

Permit Number - TR-UTL-0225-00301
Permit Status: Complete
Permit Description: Excavating a 60'x3' trench to replace gas line service in row in asphalt and dirt.
Start Date Submittal Complete Date Status  
02/24/2025 RIGHT-OF-WAY REVIEW v.1 03/27/2025 REQUIRES RESUBMIT Review Details
03/31/2025 RIGHT-OF-WAY REVIEW v.2 04/01/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0225-00301
Permit Status: Complete
Permit Description: Excavating a 60'x3' trench to replace gas line service in row in asphalt and dirt.
Total Outstanding Activity Conditions - 3
Date Name
02/26/2025 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726 **Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
02/26/2025 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
02/26/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0225-00301
Permit Description: Excavating a 60'x3' trench to replace gas line service in row in asphalt and dirt.
Total Completed Inspections - 4
Date Description Inspector Results Comments
05/06/2025 TRSP - ROW - Barricade - Setup/Routine Passed
05/06/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/06/2025 TRSP - ROW - Backfill - Placement/Compaction Passed
05/06/2025 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
DOC06280420250219061240_V1.PDF DOCUMENTS VIEW
DOC06575020250328052721_V1.PDF DOCUMENTS VIEW