Permit: TR-UTL-0225-00274
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3490 S MORMON DR
Address NEW:
3490 S MORMON DR
Apply Date:
02/13/2025
Applicant:
Chelsey Bolinger
Description:
P.067197B (KAHNA) - Previously approved/expiring permit TR-UTL-0824-01435 - BORE 3,857' & TRENCH 91’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (22) FSAI CABINET, HANDHOLES & PEDESTALS.
Permit Reviews
Permit Number - TR-UTL-0225-00274
Permit Status: Complete
Permit Description: P.067197B (KAHNA) - Previously approved/expiring permit TR-UTL-0824-01435 - BORE 3,857' & TRENCH 91’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (22) FSAI CABINET, HANDHOLES & PEDESTALS.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/19/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0225-00274
Permit Status: Complete
Permit Description: P.067197B (KAHNA) - Previously approved/expiring permit TR-UTL-0824-01435 - BORE 3,857' & TRENCH 91’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (22) FSAI CABINET, HANDHOLES & PEDESTALS.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 02/14/2025 | Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
| 02/14/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 02/14/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 02/18/2025 | Alley Restrictions Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 02/18/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
| 02/18/2025 | Pre-Activity Meeting Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 02/18/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0225-00274
Permit Description: P.067197B (KAHNA) - Previously approved/expiring permit TR-UTL-0824-01435 - BORE 3,857' & TRENCH 91’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (22) FSAI CABINET, HANDHOLES & PEDESTALS.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work completed under previously approved/expiring permit TR-UTL-0824-01435 | |
| 06/04/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Work completed under previously approved/expiring permit TR-UTL-0824-01435 | |
| 06/04/2025 | TRSP - ROW - Barricade Takedown | Passed | Work completed under previously approved/expiring permit TR-UTL-0824-01435 | |
| 06/04/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work completed under previously approved/expiring permit TR-UTL-0824-01435 | |
| 06/04/2025 | TRSP - ROW - Final | Passed | Work completed under previously approved/expiring permit TR-UTL-0824-01435 |