Permit: TR-UTL-0225-00244
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3413 N EDITH BL
Address NEW:
3413 N EDITH BL
Apply Date:
02/07/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 6'X2' BELL HOLE IN ASPHALT ROW IN ORDER TO REPAIR GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0225-00244
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 6'X2' BELL HOLE IN ASPHALT ROW IN ORDER TO REPAIR GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/07/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/11/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0225-00244
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 6'X2' BELL HOLE IN ASPHALT ROW IN ORDER TO REPAIR GAS SERVICE
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/07/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 02/07/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0225-00244
Permite Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 6'X2' BELL HOLE IN ASPHALT ROW IN ORDER TO REPAIR GAS SERVICE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0225-00244
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 6'X2' BELL HOLE IN ASPHALT ROW IN ORDER TO REPAIR GAS SERVICE
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/18/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/21/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/21/2025 | TRSP - ROW - Final | Passed |