Permit: TR-UTL-0225-00201
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1545 W HEGEL LN UNIT 2
Address NEW:
1545 W HEGEL LN UNIT 2
Apply Date:
02/03/2025
Applicant:
Sarah Latimer
Description:
EXCAVATING A 25X3 TRENCH AT 1545 W HEGEL LN #2 TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 25' NORTH OF NORTH P/L AND 72' EAST OF WEST P/L
Permit Reviews
Permit Number - TR-UTL-0225-00201
Permit Status: Complete
Permit Description: EXCAVATING A 25X3 TRENCH AT 1545 W HEGEL LN #2 TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 25' NORTH OF NORTH P/L AND 72' EAST OF WEST P/L
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/04/2025 | RIGHT-OF-WAY REVIEW v.1 | 03/07/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0225-00201
Permit Status: Complete
Permit Description: EXCAVATING A 25X3 TRENCH AT 1545 W HEGEL LN #2 TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 25' NORTH OF NORTH P/L AND 72' EAST OF WEST P/L
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/04/2025 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. |
| 02/04/2025 | The following extended traffic control set-up times were approved: |
| 02/04/2025 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0225-00201
Permit Description: EXCAVATING A 25X3 TRENCH AT 1545 W HEGEL LN #2 TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 25' NORTH OF NORTH P/L AND 72' EAST OF WEST P/L
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/08/2025 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 04/08/2025 | TRSP - ROW - Final | Passed |