Permit: TR-UTL-0225-00196
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2626 E TOWNER ST
Address NEW:
2626 E TOWNER ST
Apply Date:
02/03/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO ABANDON GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0225-00196
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO ABANDON GAS SERVICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/20/2025 | RIGHT-OF-WAY REVIEW v.2 | 02/23/2025 | APPROVED |
| 02/03/2025 | RIGHT-OF-WAY REVIEW v.1 | 02/05/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0225-00196
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO ABANDON GAS SERVICE
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/03/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 02/03/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 02/04/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0225-00196
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT IN ORDER TO ABANDON GAS SERVICE
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/27/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/28/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/28/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/28/2025 | TRSP - ROW - Final | Passed |