Permit: TR-UTL-0224-00410
Permit Details
Apply Date:
02/29/2024
Applicant:
Bobby Robbins
Description:
EXCAVATING A 44X3 FOOT TRENCH AT 1501 N. 2ND AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 44 FEET SOUTH OF SOUTH P/L AND 11 FEET WEST OF EAST P/L
Permit Reviews
Permit Number - TR-UTL-0224-00410
Permit Status: Complete
Permit Description: EXCAVATING A 44X3 FOOT TRENCH AT 1501 N. 2ND AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 44 FEET SOUTH OF SOUTH P/L AND 11 FEET WEST OF EAST P/L
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/01/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/04/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00410
Permit Status: Complete
Permit Description: EXCAVATING A 44X3 FOOT TRENCH AT 1501 N. 2ND AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 44 FEET SOUTH OF SOUTH P/L AND 11 FEET WEST OF EAST P/L
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
03/04/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
03/04/2024 | Traffic Control set-up approved between 7AM - 5PM |
03/06/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00410
Permit Description: EXCAVATING A 44X3 FOOT TRENCH AT 1501 N. 2ND AVE TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPROX 44 FEET SOUTH OF SOUTH P/L AND 11 FEET WEST OF EAST P/L
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/13/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
04/17/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
04/17/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
04/17/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
05/21/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
06/12/2024 | TRSP - ROW - Final/Close-Out | Passed |