Permit: TR-UTL-0224-00404
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2701 N COLUMBUS BL UNIT 2
Address NEW:
2701 N COLUMBUS BL UNIT 2
Apply Date:
02/29/2024
Applicant:
Carla Donaldson
Description:
EXCAVATING A 27X3 FOOR TRENCH AT 2701 N COLUMBUS BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPRX 27 FEET EAST OF EAST P/L AND 5 FOOT NORTH OF SOUTH P/L
Permit Reviews
Permit Number - TR-UTL-0224-00404
Permit Status: Complete
Permit Description: EXCAVATING A 27X3 FOOR TRENCH AT 2701 N COLUMBUS BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPRX 27 FEET EAST OF EAST P/L AND 5 FOOT NORTH OF SOUTH P/L
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00404
Permit Status: Complete
Permit Description: EXCAVATING A 27X3 FOOR TRENCH AT 2701 N COLUMBUS BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPRX 27 FEET EAST OF EAST P/L AND 5 FOOT NORTH OF SOUTH P/L
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/01/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 03/01/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00404
Permit Description: EXCAVATING A 27X3 FOOR TRENCH AT 2701 N COLUMBUS BLVD TO REPLACE GAS SERVICE IN ROW IN ASPHALT AND DIRT. TRENCH WILL BE LOCATED APPRX 27 FEET EAST OF EAST P/L AND 5 FOOT NORTH OF SOUTH P/L
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/17/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 05/08/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 05/08/2024 | TRSP - ROW - Notice of Completion | Passed |