Permit: TR-UTL-0224-00398
Permit Details
Apply Date:
02/28/2024
Applicant:
Vickie McCambridge
Description:
Place new riser on existing pole, riser down and start bore. Bore 125' of 2" conduit at a depth of 2'. Run 125' of .625 coax. Bore 675' of 2" conduit at a depth of 2'. Run 675' of .625 coax. Place new pedestal. Bore 250' of 2" conduit at a depth of 2'. Run 250' of .625 coax. Bore 155' of 2" conduit at a depth of 2'. Run 155' of .625 coax. Place new pedestal. Place new lockbox.
Permit Reviews
Permit Number - TR-UTL-0224-00398
Permit Status: Issued
Permit Description: Place new riser on existing pole, riser down and start bore. Bore 125' of 2" conduit at a depth of 2'. Run 125' of .625 coax. Bore 675' of 2" conduit at a depth of 2'. Run 675' of .625 coax. Place new pedestal. Bore 250' of 2" conduit at a depth of 2'. Run 250' of .625 coax. Bore 155' of 2" conduit at a depth of 2'. Run 155' of .625 coax. Place new pedestal. Place new lockbox.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/04/2024 | RIGHT-OF-WAY REVIEW v.2 | 03/06/2024 | APPROVED |
02/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/01/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00398
Permit Status: Issued
Permit Description: Place new riser on existing pole, riser down and start bore. Bore 125' of 2" conduit at a depth of 2'. Run 125' of .625 coax. Bore 675' of 2" conduit at a depth of 2'. Run 675' of .625 coax. Place new pedestal. Bore 250' of 2" conduit at a depth of 2'. Run 250' of .625 coax. Bore 155' of 2" conduit at a depth of 2'. Run 155' of .625 coax. Place new pedestal. Place new lockbox.
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
02/29/2024 | ROW Permit is only allowed for City of Tucson Limits. |
02/29/2024 | BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
02/29/2024 | Traffic control set-up approved between 9AM - 3:30PM |
02/29/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
02/29/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0224-00398
Permit Description: Place new riser on existing pole, riser down and start bore. Bore 125' of 2" conduit at a depth of 2'. Run 125' of .625 coax. Bore 675' of 2" conduit at a depth of 2'. Run 675' of .625 coax. Place new pedestal. Bore 250' of 2" conduit at a depth of 2'. Run 250' of .625 coax. Bore 155' of 2" conduit at a depth of 2'. Run 155' of .625 coax. Place new pedestal. Place new lockbox.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/30/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
04/30/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
04/30/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
04/30/2024 | TRSP - ROW - Final/Close-Out | Passed |