Permit: TR-UTL-0224-00374
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8535 E SPEEDWAY BL
Address NEW:
8535 E SPEEDWAY BL
Apply Date:
02/23/2024
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Installing 6" fire hydrant, 6" fire protection service, 2-1" water services with 1" water meters
Permit Reviews
Permit Number - TR-UTL-0224-00374
Permit Status: Complete
Permit Description: Installing 6" fire hydrant, 6" fire protection service, 2-1" water services with 1" water meters
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/26/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/27/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00374
Permit Status: Complete
Permit Description: Installing 6" fire hydrant, 6" fire protection service, 2-1" water services with 1" water meters
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 01/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
| 01/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 02/26/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00374
Permite Description: Installing 6" fire hydrant, 6" fire protection service, 2-1" water services with 1" water meters
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/20/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | |
| 04/04/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00374
Permit Description: Installing 6" fire hydrant, 6" fire protection service, 2-1" water services with 1" water meters
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 03/20/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 03/20/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 08/26/2024 | TRSP - ROW - Final/Close-Out | Passed |