Permit: TR-UTL-0224-00367
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1902 S OLSEN AV
Address NEW:
1902 S OLSEN AV
Apply Date:
02/23/2024
Applicant:
Desert Barricades LLC
Description:
WO T73110 - TEP to change out 2 poles and 1 anchor in ROW along side Barleycorn Lane. TEP will also require a complete street closure on Norris ave. to allow for crane parking. Updated - 5/21/2024 - Request for 90 day Renewal as of 6/02/2024
Permit Reviews
Permit Number - TR-UTL-0224-00367
Permit Status: Complete
Permit Description: WO T73110 - TEP to change out 2 poles and 1 anchor in ROW along side Barleycorn Lane. TEP will also require a complete street closure on Norris ave. to allow for crane parking.
Updated - 5/21/2024 - Request for 90 day Renewal as of 6/02/2024
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/27/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00367
Permit Status: Complete
Permit Description: WO T73110 - TEP to change out 2 poles and 1 anchor in ROW along side Barleycorn Lane. TEP will also require a complete street closure on Norris ave. to allow for crane parking.
Updated - 5/21/2024 - Request for 90 day Renewal as of 6/02/2024
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/23/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 02/23/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00367
Permit Description: WO T73110 - TEP to change out 2 poles and 1 anchor in ROW along side Barleycorn Lane. TEP will also require a complete street closure on Norris ave. to allow for crane parking.
Updated - 5/21/2024 - Request for 90 day Renewal as of 6/02/2024
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 09/03/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 09/03/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 09/03/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 09/03/2024 | TRSP - ROW - Notice of Completion | Passed |