Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0224-00366
Permit Details
Apply Date:
02/23/2024
Applicant:
Cox Communications
Description:
PRJ265526-1: Cox to Overlash 2187' to existing aerial, trench 90' and bore 150' to install CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-0224-00366
Permit Status: Complete
Permit Description: PRJ265526-1: Cox to Overlash 2187' to existing aerial, trench 90' and bore 150' to install CATV conduit for system tie.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/01/2024 | RIGHT-OF-WAY REVIEW v.2 | 03/13/2024 | APPROVED |
02/23/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/28/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00366
Permit Status: Complete
Permit Description: PRJ265526-1: Cox to Overlash 2187' to existing aerial, trench 90' and bore 150' to install CATV conduit for system tie.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
02/23/2024 | Traffic Control set-up approved between 7AM - 5PM |
02/23/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
02/23/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00366
Permit Description: PRJ265526-1: Cox to Overlash 2187' to existing aerial, trench 90' and bore 150' to install CATV conduit for system tie.
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/05/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
04/05/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
04/09/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
04/09/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
04/09/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
04/16/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
04/23/2024 | TRSP - ROW - Final/Close-Out | Passed |