Permit: TR-UTL-0224-00356
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7404 E VANCOUVER DR
Address NEW:
7404 E VANCOUVER DR
Apply Date:
02/21/2024
Applicant:
Tucson Electric Power
Description:
WO T87109. REPLACING 400 FT OF BAD PRIMARY CABLE. Continuation of work from expired permit TR-UTL-0823-02356 Update 5/2/2024: Renewed for 60 days
Permit Reviews
Permit Number - TR-UTL-0224-00356
Permit Status: Complete
Permit Description: WO T87109. REPLACING 400 FT OF BAD PRIMARY CABLE. Continuation of work from expired permit TR-UTL-0823-02356
Update 5/2/2024: Renewed for 60 days
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/21/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00356
Permit Status: Complete
Permit Description: WO T87109. REPLACING 400 FT OF BAD PRIMARY CABLE. Continuation of work from expired permit TR-UTL-0823-02356
Update 5/2/2024: Renewed for 60 days
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 02/23/2024 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 02/23/2024 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 02/23/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00356
Permite Description: WO T87109. REPLACING 400 FT OF BAD PRIMARY CABLE. Continuation of work from expired permit TR-UTL-0823-02356
Update 5/2/2024: Renewed for 60 days
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | no setup inspected |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00356
Permit Description: WO T87109. REPLACING 400 FT OF BAD PRIMARY CABLE. Continuation of work from expired permit TR-UTL-0823-02356
Update 5/2/2024: Renewed for 60 days
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/02/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 07/02/2024 | TRSP - ROW - Notice of Completion | Passed |