Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
260 S CHURCH AV
Apply Date:
02/20/2024
Applicant:
ANGEL MORALES
Description:
W.3013369-1: Access of MH 2590 for splicing

Permit Reviews

Permit Number - TR-UTL-0224-00353
Permit Status: Complete
Permit Description: W.3013369-1: Access of MH 2590 for splicing
Start Date Submittal Complete Date Status  
02/21/2024 RIGHT-OF-WAY REVIEW v.1 02/27/2024 APPROVED Review Details

Conditions

Permit Number - TR-UTL-0224-00353
Permit Status: Complete
Permit Description: W.3013369-1: Access of MH 2590 for splicing
Date Description Comments
02/23/2024 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
02/26/2024 Your project work requires that you contact City of Tucson Park Tucson Department to alert them and coordinate work as needed in freight loading zones, parking garage access, areas with parking meters and/or other permitted parking areas. Notify Park Tucson (520-791-5071) at least 24 hours before starting work for any parking restrictions that may occur within the boundaries of South 22nd, North Speedway, West Grande and East Campbell.
02/23/2024 STREET CAR
02/23/2024 Traffic control set-up approved between 9AM - 3:30PM
02/23/2024 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0224-00353
Permit Description: W.3013369-1: Access of MH 2590 for splicing
Total Completed Inspections - 4
Date Description Inspector Results Comments
04/29/2024 TRSP - ROW - Barricade - Setup/Routine Passed
04/29/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
04/29/2024 TRSP - ROW - Barricade Takedown Passed
04/29/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
W.3013369-1_TCP_02202024_V1.PDF DOCUMENTS VIEW
W.3013369-1_CAD_02202024_V1.PDF DOCUMENTS VIEW