Permit: TR-UTL-0224-00321
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
101 N LONGFELLOW AV
Address NEW:
101 N LONGFELLOW AV
Apply Date:
02/14/2024
Applicant:
eligio pena
Description:
5X5 BELL HOLE 5 FEET INTO ASPHALT TO REPLACE GAS LINE. UNIT #1
Permit Reviews
Permit Number - TR-UTL-0224-00321
Permit Status: Complete
Permit Description: 5X5 BELL HOLE 5 FEET INTO ASPHALT TO REPLACE GAS LINE. UNIT #1
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/14/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/16/2024 | REQUIRES RESUBMIT |
| 03/01/2024 | RIGHT-OF-WAY REVIEW v.2 | 03/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00321
Permit Status: Complete
Permit Description: 5X5 BELL HOLE 5 FEET INTO ASPHALT TO REPLACE GAS LINE. UNIT #1
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/01/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 03/01/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 03/01/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
| 03/01/2024 | Prop 411 project work area, Contact Nick Germanos at Nick.Germanod@tucsonaz.gov prior to start of work. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00321
Permite Description: 5X5 BELL HOLE 5 FEET INTO ASPHALT TO REPLACE GAS LINE. UNIT #1
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | |
| 05/08/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00321
Permit Description: 5X5 BELL HOLE 5 FEET INTO ASPHALT TO REPLACE GAS LINE. UNIT #1
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/22/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/08/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 07/18/2024 | TRSP - ROW - Notice of Completion | Passed |