Permit: TR-UTL-0224-00289
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8116 E COLETTE PL
Address NEW:
8116 E COLETTE PL
Apply Date:
02/09/2024
Applicant:
Jaime Hoyt - Trafficade
Description:
2745235 8116 e Colette Pl 14-15-09SW relocate water main front north side of the posted address in road: 30lf asphalt/ mlm
Permit Reviews
Permit Number - TR-UTL-0224-00289
Permit Status: Complete
Permit Description: 2745235 8116 e Colette Pl 14-15-09SW relocate water main front north side of the posted address in road: 30lf asphalt/ mlm
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/09/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/12/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00289
Permit Status: Complete
Permit Description: 2745235 8116 e Colette Pl 14-15-09SW relocate water main front north side of the posted address in road: 30lf asphalt/ mlm
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 02/12/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 02/12/2024 | PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00289
Permite Description: 2745235 8116 e Colette Pl 14-15-09SW relocate water main front north side of the posted address in road: 30lf asphalt/ mlm
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required | |
| 03/18/2024 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | |
| 03/18/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00289
Permit Description: 2745235 8116 e Colette Pl 14-15-09SW relocate water main front north side of the posted address in road: 30lf asphalt/ mlm
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 03/18/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 03/18/2024 | TRSP - ROW - Final/Close-Out | Passed |