Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1502 E OLD VAIL RD
Apply Date:
02/07/2024
Applicant:
Adriana Marinez
Description:
TEP is required by the state to post public notice signs, noticing the public of future transmission line routes. The Arizona Corporation Commission recently approved the Aerospace Research Campus Transmission Project, a 1.5 mile transmission line route along E. Old Vail Connection.

Permit Reviews

Permit Number - TR-UTL-0224-00263
Permit Status: Complete
Permit Description: TEP is required by the state to post public notice signs, noticing the public of future transmission line routes. The Arizona Corporation Commission recently approved the Aerospace Research Campus Transmission Project, a 1.5 mile transmission line route along E. Old Vail Connection.
Start Date Submittal Complete Date Status  
02/08/2024 RIGHT-OF-WAY REVIEW v.1 02/13/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0224-00263
Permit Status: Complete
Permit Description: TEP is required by the state to post public notice signs, noticing the public of future transmission line routes. The Arizona Corporation Commission recently approved the Aerospace Research Campus Transmission Project, a 1.5 mile transmission line route along E. Old Vail Connection.
Total Outstanding Activity Conditions - 1
Date Name
02/09/2024 The following extended traffic control set-up times were approved for 24 hr placement.

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-UTL-0224-00263
Permite Description: TEP is required by the state to post public notice signs, noticing the public of future transmission line routes. The Arizona Corporation Commission recently approved the Aerospace Research Campus Transmission Project, a 1.5 mile transmission line route along E. Old Vail Connection.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/11/2024 TRSP - ROW - SITE INSPECTION N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-0224-00263
Permit Description: TEP is required by the state to post public notice signs, noticing the public of future transmission line routes. The Arizona Corporation Commission recently approved the Aerospace Research Campus Transmission Project, a 1.5 mile transmission line route along E. Old Vail Connection.
Total Completed Inspections - 1
Date Description Inspector Results Comments
03/04/2025 TRSP - ROW - Final/Close-Out Passed Public notice signs are all still up and intact and the transmission lines seem to be installed and in place. Work appears to be completed.