Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-0224-00260
Permit Details
Apply Date:
02/07/2024
Applicant:
BeaJaye Laprath
Description:
APC(AKA: APL - Arizona Pipeline) WILL NEED TO EXCAVATE A 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-0224-00260
Permit Status: Complete
Permit Description: APC(AKA: APL - Arizona Pipeline) WILL NEED TO EXCAVATE A 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/07/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/08/2024 | REQUIRES RESUBMIT |
02/08/2024 | RIGHT-OF-WAY REVIEW v.2 | 02/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00260
Permit Status: Complete
Permit Description: APC(AKA: APL - Arizona Pipeline) WILL NEED TO EXCAVATE A 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
02/08/2024 | Traffic Control set-up approved between 7AM - 5PM |
02/08/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
02/08/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00260
Permite Description: APC(AKA: APL - Arizona Pipeline) WILL NEED TO EXCAVATE A 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/01/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00260
Permit Description: APC(AKA: APL - Arizona Pipeline) WILL NEED TO EXCAVATE A 5X5 BELLHOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/21/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
02/29/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
02/29/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
05/01/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
05/01/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
05/01/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
06/12/2024 | TRSP - ROW - Final/Close-Out | Passed |