Permit: TR-UTL-0224-00255
Permit Details
Apply Date:
02/07/2024
Applicant:
Vickie McCambridge
Description:
New ped and vault to be placed in order to house new coax and fiber and all equipment and cases necessary for new node upgrade project being conducted. Bore up Via Entrada towards East River rd approximately 800' then turn and continue boring roughly another 1,700' to existing vault and fiber case where we will be tieing in to existing comcast infrastructure
Permit Reviews
Permit Number - TR-UTL-0224-00255
Permit Status: Issued
Permit Description: New ped and vault to be placed in order to house new coax and fiber and all equipment and cases necessary for new node upgrade project being conducted. Bore up Via Entrada towards East River rd approximately 800' then turn and continue boring roughly another 1,700' to existing vault and fiber case where we will be tieing in to existing comcast infrastructure
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/14/2024 | RIGHT-OF-WAY REVIEW v.2 | 02/21/2024 | APPROVED |
02/07/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/09/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00255
Permit Status: Issued
Permit Description: New ped and vault to be placed in order to house new coax and fiber and all equipment and cases necessary for new node upgrade project being conducted. Bore up Via Entrada towards East River rd approximately 800' then turn and continue boring roughly another 1,700' to existing vault and fiber case where we will be tieing in to existing comcast infrastructure
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
02/07/2024 | BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION |
02/07/2024 | City Limits Only ROW Permit is only allowed for City of Tucson Limits. |
02/07/2024 | Traffic control set-up approved between 9AM - 3:30PM |
02/07/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-UTL-0224-00255
Permite Description: New ped and vault to be placed in order to house new coax and fiber and all equipment and cases necessary for new node upgrade project being conducted. Bore up Via Entrada towards East River rd approximately 800' then turn and continue boring roughly another 1,700' to existing vault and fiber case where we will be tieing in to existing comcast infrastructure
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/04/2024 | TRSP - ROW - SWBMP | N/A | Re-inspection required | |
04/04/2024 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required | |
04/04/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | N/A | Re-inspection required | |
04/04/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Re-inspection required | |
04/04/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | N/A | Re-inspection required | |
04/04/2024 | TRSP - ROW - Barricade Takedown | N/A | Re-inspection required | |
04/04/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-0224-00255
Permit Description: New ped and vault to be placed in order to house new coax and fiber and all equipment and cases necessary for new node upgrade project being conducted. Bore up Via Entrada towards East River rd approximately 800' then turn and continue boring roughly another 1,700' to existing vault and fiber case where we will be tieing in to existing comcast infrastructure
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/05/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
04/09/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
04/10/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | ||
04/09/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
05/07/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
05/07/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
05/07/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
05/07/2024 | TRSP - ROW - Final/Close-Out | Passed |