Permit: TR-UTL-0224-00253
Permit Details
Apply Date:
02/07/2024
Applicant:
Think Safety Inc
Description:
Cox to pull 3' of fiber through existing conduit and aerial overlash 629' for system tie. Revised update: 4/15/2024 ADOT TCP Revised
Permit Reviews
Permit Number - TR-UTL-0224-00253
Permit Status: Complete
Permit Description: Cox to pull 3' of fiber through existing conduit and aerial overlash 629' for system tie.
Revised update: 4/15/2024 ADOT TCP Revised
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/15/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/15/2024 | APPROVED |
03/26/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/02/2024 | APPROVED |
02/07/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/07/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0224-00253
Permit Status: Complete
Permit Description: Cox to pull 3' of fiber through existing conduit and aerial overlash 629' for system tie.
Revised update: 4/15/2024 ADOT TCP Revised
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
02/07/2024 | BUS STOP IN AREA, CONTACT SUN TRAN DISPATCH AT 520-206-8934 AT LEAST 48-BUISNESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
02/07/2024 | Traffic control set-up approved between 9AM - 3:30PM |
02/07/2024 | PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
02/08/2024 | City Limits Only ROW Permit is only allowed for City of Tucson Limits. |
04/02/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-0224-00253
Permit Description: Cox to pull 3' of fiber through existing conduit and aerial overlash 629' for system tie.
Revised update: 4/15/2024 ADOT TCP Revised
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/27/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
09/03/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
09/03/2024 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
09/06/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
09/11/2024 | TRSP - ROW - Final/Close-Out | Passed |